The Scope

AusGroup carried out one of the highest profile jobs for the shutdown which includes the removal of the old HHeX and all supporting ducts, followed by the installation of the new HHeX with newly configured ducts, insulation and support towers.In preparation, the HHeX was relocated from the laydown area to the staging area onsite ready for the shutdown.

The removal and installation of the HHeX required powerline works, multiple dual crane lifts and a specialised truck to manoeuvre the HHeX that weighed 140 tonnes and measured 26 meters in height.

AusGroup Kwinana Operations played an integral part of the shutdown by fabricating the new stainless steel ducts and support towers made from exotic metals.

CASE STUDIES

Wheatstone Turnaround Planning (TAR 501/502)

The Wheatstone Asset’s turnaround (TAR) maintenance project commenced with the extensive planning services provided by AusGroup…

Chevron Potable Water Project

  Fabrication, painting, insultation and installation of : 7.5km of pipeline, 300 spools, 100 tonne of…

Southern Seawater Desalination Plant – Structural, Mechanical & Installation

The scope of work for AGC covered the structural, mechanical and installation work associated with the…