The Project

The areas covered in the scope are Front-line and campaign maintenance; Brownfield execution scopes; Turnarounds and planning/unplanned outages over the contracted 3-year period.

To date, AusGroup provided the following Services to CSBP:

  • SMP
  • Welding & Fabrication (on-site and off-site)
  • Rope access (all trades)
  • PIF
  • Scaffolding including engineering services
  • Crane operation (rigging) and maintenance
  • Lifting & rigging equipment services
  • Industrial Services

CASE STUDIES

Acciona Waste to Energy Modules

East Rockingham Waste to Energy Project (ERWtE) Boiler Hall Structural Offsite Pre-Assembly

Wheatstone: Scaffolding

In support of the Brownfields Projects Team at Wheatstone, Ausgroup was requested to provide scaffolding services.…

CBH Ship Loader Refurbishment Contract

AGC was contracted to refurbish Ship Loaders 3 and 4 at Kwinana for CBH. The scope…