Salt processing has its complexities with constant corrosion, so emphasis was placed on specialist surface treatment on the booms and the isolation of stainless steel from carbons.
The two CV401 and CV402 Stacker Booms were transported from AusGroup Kwinana Operations to site in Dampier ready for the team to install on site.
- (2) Boom lengths: 33 meters each
- Weight: 18 tonnes each
- Specialist fabrication and welding
- Specialist Surface Treatment to prevent salt
corrosion - Transportation planning from AusGroup Kwinana
facility to the project location in Dampier - Transportation of structure to site
- Onsite installation and ground support crews
CASE STUDIES
Woodside-operated North West Shelf (NWS) Project – Karratha Gas Plant (KGP) Multidiscipline Services Agreement (MDSA)
The scope of work focused on mechanical works, structural steel, site installation and welding, inspection, cladding…
Dampier Salt Truss, Lifting Bean and SS Chute Fabrication (CV02)
The Project Dampier Salt engaged AusGroup to fabricate, assemble and deliver various replacement components of the…
Rio Tinto Cape Lambert Screenhouse Rebuild
AusGroup was commissioned for the supply, fabrication, surface treatment and assembly of structural steel, platework, handrails,…