Salt processing has its complexities with constant corrosion, so emphasis was placed on specialist surface treatment on the booms and the isolation of stainless steel from carbons.

The two CV401 and CV402 Stacker Booms were transported from AusGroup Kwinana Operations to site in Dampier ready for the team to install on site.

  • (2) Boom lengths: 33 meters each
  • Weight: 18 tonnes each
  • Specialist fabrication and welding
  • Specialist Surface Treatment to prevent salt
    corrosion
  • Transportation planning from AusGroup Kwinana
    facility to the project location in Dampier
  • Transportation of structure to site
  • Onsite installation and ground support crews

CASE STUDIES

Woodside Greater Western Flank – Subsea Pipe Spools

As part of the Greater Western Flank Project Phase 1, AGC was subcontracted by Fugro-TSM to…

Woodside LTCS Bore Spools and Pipes

Fabrication of low temperature carbon steel (LTCS) and duplex bore spools and large pipe bridges and…

Wheatstone Loading Arm Remediation

The Product Loading Facility (PLF) Loading Arm Remediation Project was initiated to provide permanent solutions for…