Fabrication Location – Kwinana workshop

  • Bay 1 Carbon Steel Fabrication
  • Bay 2 Stainless Steel Fabrication
  • In-House painting
  • Assembly in Bay 1

Client Site Location

These project works were destined for the client’s salt processing location at their Lake MacLeod (Site) in the Gascoyne region of Western Australia, approximately 900 km North of Perth. The Project Site is located within the SP1 stockpile area at Lake MacLeod’s out loading facility at Cape Cuvier.

A Client Win

AusGroup provided a one-stop-shop fabrication, assembly, PIF and installation solution for the client with all 3rd party inspections being complied with throughout the process.

An AusGroup Win

The client was extremely impressed with the timeline AusGroup achieved and our agility when we had to react to change.

CASE STUDIES

Rio Tinto Alcan Yarwun – Maintenance Contract

AGC was commissioned to provide Yarwun with a range of integrated services including; refractory, mechanical and…

Chevron Gorgon BOG Flare Maintenance

The scope involved recoating the entire BOG Flare pipeline in the SA Modules. The larger diameter…

Dampier Salt Stacker Fabrication and Install (CV007)

As part of contract CV007 AusGroup fabricated approx. 77t of steelwork fabrication for a replacement stacker…