
The Project
Fabrication and assembly of 4 complete long travel bogies including:
- 2-wheel Bogies
- 4-wheel equalizers
- 6-wheel equalizers
- 12-wheel equalizers
- Specialist machining and welding
- Painting and surface treatment
- Transporation to NSW
CASE STUDIES
Chevron Gorgon ABU Turnarounds 101 & 106
AusGroup were awarded the delivery of PIF and Access for Gorgon’s TAR101 and TAR106 from Phase…
INPEX-operated Ichthys LNG Project – Painting, Insulation & Fireproofing
AGC Meisei Joint Venture (AMJV) was awarded the contract for the onshore facilities of the INPEX-operated…
Woodside Energy Limited – Fabrication Services Contract
AGC was awarded the contract for the provision of fabrication services in support of the maintenance…