The Project

Fabrication and assembly of 4 complete long travel bogies including:

  • 2-wheel Bogies
  • 4-wheel equalizers
  • 6-wheel equalizers
  • 12-wheel equalizers
  • Specialist machining and welding
  • Painting and surface treatment
  • Transporation to NSW

CASE STUDIES

Chevron Gorgon ABU Turnarounds 101 & 106

AusGroup were awarded the delivery of PIF and Access for Gorgon’s TAR101 and TAR106 from Phase…

INPEX-operated Ichthys LNG Project – Painting, Insulation & Fireproofing

AGC Meisei Joint Venture (AMJV) was awarded the contract for the onshore facilities of the INPEX-operated…

Woodside Energy Limited – Fabrication Services Contract

AGC was awarded the contract for the provision of fabrication services in support of the maintenance…