The Scope

AusGroup, as the Primary Maintenance Contractor (PMC) for our client, performed this 2nd Turnaround project which included:

  • Event management; planning and scheduling
  • Work packing – Permits/isolations
  • Mechanical, Electrical and Instrumentation work
  • Painting, insulation and fire proofing work
  • Scaffolding, lifting and rigging
  • Production support
  • Materials and resource supply
  • Quality control
  • Completions activities

Performance Summary

  • POB – 922 (825 D/S and 97 U/S)
  • 1391 Job Packs
  • >150,000 ‘Person’ hours
  • 0 Days away from work (DAFW)
  • 0 Loss of containment (Tier 1, 2 and 3)

 

 

CASE STUDIES

Fabrication of complete Long Travel Bogie Assemblies

AusGroup were contracted by the client to fabricate, assemble and transport 4 ship loader long travel…

Karara Iron Ore Project SMP Preferred Supplier

Following the award of the Early Works Contract in March 2011, AGC continued to support Karara…

Jimblebar Iron Ore Mine

AGC was selected as the contractor for works on the expansion project. The scope was for…