Shutdown and Turnaround Expertise

AusGroup has the capability and experience to perform shutdowns/turnarounds projects for both the Energy and Resources sector, to suit any project of all sizes, ensuring safe, timely and efficient delivery at all times. We understand that HSE and schedule are some of the most important aspects of any shutdown/turnaround, and our teams work to ensure safe, timely and efficient delivery.

We offer support for planned upgrades as well as emergency maintenance and repair.

This involves using our experienced personnel to provide professional and rigorous planning and preparation as necessary, to minimise the impact on production within live plant and brownfield environments.

CASE STUDIES

Integrated Turnaround Maintenance Project for LNG Asset

The sixth in planned turnaround maintenance programs for a key LNG operator in the North West…

Turnaround Maintenance Project for LNG Upstream and Downstream

The Project The second of the planned turnaround maintenance programs for a key LNG operator in…

Dampier Salt Truss, Lifting Bean and SS Chute Fabrication (CV02)

The Project Dampier Salt engaged AusGroup to fabricate, assemble and deliver various replacement components of the…

Dampier Salt Stacker Fabrication and Install (CV007)

As part of contract CV007 AusGroup fabricated approx. 77t of steelwork fabrication for a replacement stacker…

Wheatstone Loading Arm Remediation

The Product Loading Facility (PLF) Loading Arm Remediation Project was initiated to provide permanent solutions for…

Wheatstone Potable Water Line Replacement

Ausgroup was engaged to complete the Potable Water line replacement at the Wheatstone facility. The Scope…

Woodside LTCS Bore Spools and Pipes

Fabrication of low temperature carbon steel (LTCS) and duplex bore spools and large pipe bridges and…

Wheatstone Turnaround Planning (TAR 501/502)

The Wheatstone Asset’s turnaround (TAR) maintenance project commenced with the extensive planning services provided by AusGroup…

Wheatstone onshore and offshore turnaround (TAR 501)

  AusGroup was awarded the Primary Maintenance Contract (PMC) for the delivery of Wheatstone’s first major…

Chevron Gorgon BOG Flare Maintenance

The scope involved recoating the entire BOG Flare pipeline in the SA Modules. The larger diameter…

Thevenard Island Retirement Project – Deconstruction

Initial scope included the demolition of the Old Accommodation Camp and removal and disposal of underground…

CSBP Brownfield Maintenance and Support Services

AusGroup were awarded a contract brownfield maintenance and in 2020 to provide support services for the…

BHP Nickel West Shutdown and Maintenance

AGC were awarded the Removal and Replacement of Hot Heat Exchanger (HHeX) Project to be executed…

Gorgon Reliable Instrument Air Generation (RIAG) Project

AusGroup were awarded the fabrication of the modules for the Reliable Instrument Air Generation (RIAG) Project…

Chevron Fin Fan Heat Exchanger Blade Pitch Change

Confirm the identify the equipment and implement electrical isolation, open safety guards for access, adjust and…

Chevron Gorgon ABU Turnarounds 101 & 106

AusGroup were awarded the delivery of PIF and Access for Gorgon’s TAR101 and TAR106 from Phase…

FMG Spirals and Launder Changeout

Material supply, existing spirals removal, steel modification and replacement with new spirals and launder systems including…

Woodside Greater Western Flank – Subsea Pipe Spools

As part of the Greater Western Flank Project Phase 1, AGC was subcontracted by Fugro-TSM to…

Woodside Energy Limited – Fabrication Services Contract

AGC was awarded the contract for the provision of fabrication services in support of the maintenance…

Sino Iron Project Power Plant – Thermal Insulation

The scope involved the application of thermal insulation and cladding to piping and equipment for the…

Rio Tinto Alcan Yarwun – Maintenance Contract

AGC was commissioned to provide Yarwun with a range of integrated services including; refractory, mechanical and…

Nyrstar Zinc Works – Shutdown, Refractory and Associated Works

AGC was selected as Nyrstar’s refractory and scaffolding contractor for its 2014 and 2017 Major Turnarounds.…

CBH Ship Loader Refurbishment Contract

AGC was contracted to refurbish Ship Loaders 3 and 4 at Kwinana for CBH. The scope…