The Scope

AusGroup provided support to the Primary Maintenance Contractor (PMC) with services which included:

  • Event management; planning and scheduling
  • Work packing – Permits/isolations
  • Blasting and painting
  • Hot, cryogenic insulation and foam injection
  • Fire protection works
  • Scaffolding, lifting and rigging
  • Rope Access technicians
  • Stainless steel fabrication
  • Quality control
  • Completions activities
  • Engineered scaffold designs

PAINTING, INSULATION, PASSIVE FIREPROTECTION AND ACCESS

  • Scaffolding solution
  • Erection and dismantle of encapsulation
  • Blasting and painting
  • PFP application
  • Stainless Steel box fabrications
  • Removal and replacement of:
    • Insulated instrumentation andtubing
    • Cladding and insulation
    • Valves and Flanges
    • Vessel and columns

PERFORMANCE SUMMARY

  • 105,000 Man hours
  • 350+ Permits written
  • 356 Tons of scaffold erected
  • 346 PIF ITR’s completed
  • 200+ Stainless steel boxes fabricated
  • 228sqm Insulation installed
  • 14sqm Fireproofing installed

CASE STUDIES

Sino Iron Project Power Plant – Thermal Insulation

The scope involved the application of thermal insulation and cladding to piping and equipment for the…

Dampier Salt Truss, Lifting Bean and SS Chute Fabrication (CV02)

The Project Dampier Salt engaged AusGroup to fabricate, assemble and deliver various replacement components of the…

Chevron Australia Master Contractor Services Contract

AGC provides brownfield maintenance and support services to Chevron Australia for the operational phase of its…