Continuous Improvement Initiatives

  • To streamline production all metal cladding and insulation are CAD-CAM and CNC cut. QA check done at third party automated cutting company to avoid delay on schedule and rework downstream.
  • Items are packed by work packs and labelled for ease of traceability and identification to avoid any form of double handling.
  • Proposed change of design for the spacers for the personnel protection metal cladding, with the benefit of streamline fabrication and installation and therefore offering saving to the client.
  • Extended cross-checking and communication between site survey personnel and fabrication team to simplify manufacturing process and increase efficiency on the shop floor avoiding rework.

CASE STUDIES

Chevron Gorgon BOG Flare Maintenance

The scope involved recoating the entire BOG Flare pipeline in the SA Modules. The larger diameter…

CSBP Brownfield Maintenance and Support Services

AusGroup were awarded a contract brownfield maintenance and in 2020 to provide support services for the…

Chevron-operated Gorgon Project, Jetty and Marine Structure – Offshore Insulation

AGC was awarded the contract for the supply and installation of cryogenic insulation to the infill…