Continuous Improvement Initiatives
- To streamline production all metal cladding and insulation are CAD-CAM and CNC cut. QA check done at third party automated cutting company to avoid delay on schedule and rework downstream.
- Items are packed by work packs and labelled for ease of traceability and identification to avoid any form of double handling.
- Proposed change of design for the spacers for the personnel protection metal cladding, with the benefit of streamline fabrication and installation and therefore offering saving to the client.
- Extended cross-checking and communication between site survey personnel and fabrication team to simplify manufacturing process and increase efficiency on the shop floor avoiding rework.
CASE STUDIES
Chevron Substation Lighting Facilities Maintenance
Site wide replacement of light tubes for all substation lighting. Replacement of faulty light fittings, battery…
Wheatstone onshore and offshore turnaround (TAR 501)
AusGroup was awarded the Primary Maintenance Contract (PMC) for the delivery of Wheatstone’s first major…
Waste-to-Energy Plant Project (ERWtE)
Boiler Hall, Baghouse & Hopper Construction, Fabrication and onsite installation for the East Rockingham Waste to…