The Shoemaker Levy project involves the expansion into a second stage nickel laterite deposit which will give RNO a LOM of approximately 30 years.
The scope involves the full assembly, alignment, construction verification and preparation for shipment for all 33 prefabricated truss sections.
Each of the sections were fabricated overseas and shipped to Ausgroup’s Kwinana facility where they were organised, assembled and outfitted with grating, handrail and idler rollers.
Watch the video here.
CASE STUDIES
Chevron Potable Water Project
Fabrication, painting, insultation and installation of : 7.5km of pipeline, 300 spools, 100 tonne of…
Lime Silo Fabrication
Fabrication of 12 x Lime Silos.
Acciona Waste to Energy Modules
East Rockingham Waste to Energy Project (ERWtE) Boiler Hall Structural Offsite Pre-Assembly