The Shoemaker Levy project involves the expansion into a second stage nickel laterite deposit which will give RNO a LOM of approximately 30 years.

The scope involves the full assembly, alignment, construction verification and preparation for shipment for all 33 prefabricated truss sections.

Each of the sections were fabricated overseas and shipped to Ausgroup’s Kwinana facility where they were organised, assembled and outfitted with grating, handrail and idler rollers.

Watch the video here.

CASE STUDIES

Chevron-operated Gorgon Project – Fabrication Contracts

The scope of work comprised of three fabrication contracts; adjustable pipe supports, pipe spools, and shear…

Fabrication of complete Long Travel Bogie Assemblies

AusGroup were contracted by the client to fabricate, assemble and transport 4 ship loader long travel…

Dampier Salt Mine Twin Stacker Boom

AusGroup was commissioned to fabricate, machine, surface treat, assemble and install the two CV401 & CV402…